Wind power projects:
We have been involved with wind power projects in recent years:
-Merijärvi/Pyhänkoski wind power plant in year 2012. There was built six wind power turbines, we did all mining and blasting there.
– Kopsa1 was made in 2013. There was built six wind power turbines, we did there all mining and blasting for ground work and road.
– Mäkikangas wind farm 2013. There was built eleven wind power turbines, we did there all mining and blasting for ground work and road.
– Kopsa 2 in year 2014. There was built ten wind turbines. We made there all mining and blasting for ground work, roads and cable groove.
– Saarenkylä windfarm 2015, Vieskajärvi, Alavieska. There were built nine wind power turbines.
– Tohkoja wind farm, Kalajoki 2015-2016
Mass excavation for these wind farms were also made by us.

Other works:
We have made drilling and blasting to build new residential areas e.g. for the town of Ylivieska since 2008.
Valio Oy, Haapavesi foundations 2012
S-market Haapavesi, foundations 2013
Double track Kokkola – Riippa RU1 mining 2013
Double track Riippa – Eskola RU2 mining 2013-2014
Oulu city Asunto Oy Resina-block ground quarrying in 2013

Sewer works:
Kiiminki 2009, Sievin asemakylä sewer 2010, Haapajärvi-Nivala 2012, Otanmäki – Kajaani 2014, Pyhäjoki – Hanhikivi 2015

Canal mining about 10 000-30 000 mᶾ/year
Mass excavation crushing plants about 500 000-2 000 000 ton/year